Build a project budget by adding staff, billing rates, tasks, expenses, and subconsultants as needed. Creating the budget moves the project into the Proposal stage. You can also print an estimate to share with your client before contracting the budget.
Step-by-Step Guide
-
Open the Project and Create Its Budget
Open Projects, select the project name, and choose Budget. Click Create Budget.
If the project already has an editable budget, open that budget to continue. For changes to tasks or expenses on an already contracted project, see Modifying a Budget.
-
Add Staff and Project Billing Rates
Select Staff & Rates, then use Add Employee to add the employees who will work on the project.
Each employee’s billing rate initially comes from their profile. To use a different rate for this project, enter it in the New column and click Save.
Optional Calculator
Select employees using the calculator checkboxes, choose a calculation method, and review the resulting project rates before saving.
⚠ Important: An employee must be included in Staff & Rates before they can enter time against the project.
For task-specific rate adjustments, see Configure Rate Factors in a Project Budget.
-
Add Labor Tasks and Estimated Hours
Open the editable Budget tab beside Staff & Rates.
Enter each task’s number and name, then enter the estimated hours for the employees assigned to that task. Review the calculated task amounts.
Task numbers control the order of the list. You can use numbers or letters, such as 3a after task 3.
Leave Lump unchecked for Time & Materials (T&M) billing, or select it for Lump Sum billing. You can use both billing types within the same project. See Combined Billing Types for the differences and budget overrides.
Click Save.
-
Add Expenses and Subconsultants, if Needed
In Expenses, enter the description, quantity, price, and any applicable markup for each planned expense. Review its total. Select Lump for expenses that will use Lump Sum billing.
For a subconsultant expense, select Sub and choose the firm from the Description dropdown. If the firm is missing, follow Adding Subconsultants, then return to the budget.
Click Save.
-
Review and Save the Budget
Review the staff, project billing rates, task hours, billing types, and planned expenses. Check the labor, expense, and overall budget totals, then save any changes.
Note: If the project requires an advance payment, you can establish a retainer when the budget is contracted. A retainer can also be added later through a Budget Modification. See Applying Retainers for the complete retainer workflow.
-
Print an Estimate — Optional
Click Print above the Labor section to open Print Project Budget.
Choose the language and available rendering options, including Project summary, Task details, Direct Expenses Details, and Staff Summary.
Review any warnings. Overridden task totals can affect whether staff hours or the Staff Summary appear in the output.
Click Print to open the PDF, then download it to share with your client.
-
Update Staff and Rates After Contracting — Optional
Open Staff & Rates and select +Add Staff/Rates to add employees or change project billing rates through a new rate set.
Enter the effective date and review the invoice period the change is intended to affect before saving.
A rate set captured by a finalized invoice may no longer be editable.
Success
Your project budget is prepared. The project remains in Proposal until you contract the budget.